Ohio Inspectors Find Local Inspection Services

Best Well Installation in Toledo, OH

Compare 8 local well installation providers in Toledo. Verified listings with real contact info.

8 verified providers · Updated 2026-04-07

Quick Compare

1

E&K Contractors

4.6 ★ (199 reviews)

Call
2

Shidler & Wilder Wells & Pumps

5.0 ★ (3 reviews)

Call
3

Kimball Well Drilling

4.9 ★ (12 reviews)

Call
1

E&K Contractors

4.6 (199 reviews)
4030 Fitch Rd, Toledo, OH 43613
Open 24 Hours
2

Shidler & Wilder Wells & Pumps

5.0 (3 reviews)
Maumee, OH 43537, USA
Mon–Fri 8am–5pm · Sat–Sun Closed
3

Kimball Well Drilling

4.9 (12 reviews)
2320 N Billman Rd, Genoa, OH 43430
Mon–Fri 8am–5pm · Sat–Sun Closed
4

Wilder Wells and Pumps

4.4 (77 reviews)
17333 Ida Center Rd, Petersburg, MI 49270
Mon–Fri 8am–5pm · Sat–Sun Closed
5

Able Well Drilling

4.8 (44 reviews)
14962 Sand Ridge Rd, Bowling Green, OH 43402
Mon–Fri 8am–4pm · Sat–Sun Closed
6

Mock's Well Drilling

5.0 (2 reviews)
3859 Co Rd C, Swanton, OH 43558
7

Walter's Well Drilling

5.0 (15 reviews)
124 Highland Ave, Delta, OH 43515
8

Water Solutions of Lenawee

4.9 (58 reviews)
1224 Academy Rd, Adrian, MI 49221
Mon–Fri 7am–4pm · Sat–Sun Closed

Frequently Asked Questions

How much does a complete well installation cost in Pennsylvania?

A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.

What's included in a complete well installation?

A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.

How long does it take to install a complete well system?

The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.

More Well Installation Nearby

Related Services in Toledo

All services in Toledo, OH →