Ohio Inspectors Find Local Inspection Services

Best Well Installation in Cleveland, OH

Compare 10 local well installation providers in Cleveland. Verified listings with real contact info.

10 verified providers · Updated 2026-04-07

Quick Compare

1

Ayers Well Drilling

4.6 ★ (30 reviews)

Call
2

Valley Well & Pump Services Inc

4.6 ★ (7 reviews)

Call
3

Anderson Drilling & Pump Inc

4.6 ★ (10 reviews)

Call
1

Ayers Well Drilling

4.6 (30 reviews)
10743 Chillicothe Rd, Kirtland, OH 44094
Mon–Fri 8am–5pm · Sat–Sun Closed
2

Valley Well & Pump Services Inc

4.6 (7 reviews)
1677 Stine Rd, Peninsula, OH 44264
Mon–Fri 7am–6pm · Sat 7am–5pm · Sun Closed
3

Anderson Drilling & Pump Inc

4.6 (10 reviews)
4986 Darrow Rd, Stow, OH 44224
Mon–Fri 8am–4pm · Sat–Sun Closed
4

Depew Well Drilling Inc

4.8 (98 reviews)
3459 Granger Rd, Medina, OH 44256
Mon–Fri 8am–5pm · Sat–Sun Closed
5

Akron Well Drilling

3.8 (4 reviews)
3867 W Market St #239, Akron, OH 44333
Open 24 Hours
6

Denny Herr & Sons Well Drilling

4.4 (45 reviews)
11304 Chamberlain Rd, Aurora, OH 44202
Mon–Sat 8am–5pm · Sun Closed
7

Max Herr Well Drilling & Pump

4.5 (19 reviews)
3049 E Pioneer Trail, Aurora, OH 44202
Mon–Sun 8am–5pm
8

Fredebaugh Well Drilling Company

5.0 (3 reviews)
714 Lakeshore Blvd, Painesville, OH 44077
Mon–Fri 8am–4:30pm · Sat–Sun Closed
9

Harper Well & Pump, Inc.

4.8 (73 reviews)
10033 OH-44, Mantua, OH 44255
Mon–Fri 8am–4:30pm · Sat–Sun Closed
10

ACES WELL SERVICE, LLC

5.0 (19 reviews)
6391 Allyn Rd, Hiram, OH 44234
Mon–Fri 8am–4pm · Sat–Sun Closed

Frequently Asked Questions

How much does a complete well installation cost in Pennsylvania?

A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.

What's included in a complete well installation?

A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.

How long does it take to install a complete well system?

The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.

More Well Installation Nearby

Related Services in Cleveland

All services in Cleveland, OH →