Ohio Inspectors Find Local Inspection Services

Best Well Installation in Ashland, OH

Compare 9 local well installation providers in Ashland. Verified listings with real contact info.

9 verified providers · Updated 2026-04-07

Quick Compare

1

Rex Drilling

4.2 ★ (6 reviews)

Call
2

Aqua Ace Water Conditioning

5.0 ★ (3 reviews)

Call
3

Jamison Well Drill & Pump Services

4.4 ★ (106 reviews)

Call
1

Rex Drilling

4.2 (6 reviews)
1242 Colonial Dr, Ashland, OH 44805
2

Aqua Ace Water Conditioning

5.0 (3 reviews)
1805 Township Rd 1255, Ashland, OH 44805
3

Jamison Well Drill & Pump Services

4.4 (106 reviews)
258 Central Ave, Mansfield, OH 44905
Open 24 Hours
4

B and E Water Well Service LLC

5.0 (2 reviews)
1604 Walker Lake Rd, Ontario, OH 44906
Open 24 Hours
5

Duncan Drilling Co

5.0 (13 reviews)
1006 Co Hwy 2796, Perrysville, OH 44864
Mon–Sat 8am–8pm · Sun Closed
6

Jackson Well Services

4.8 (103 reviews)
1051 Mill Rd, Bellville, OH 44813
Mon–Fri 7am–4pm · Sat–Sun Closed
7

Flinner Drilling Inc.

4.7 (30 reviews)
2031 Millersburg Rd, Wooster, OH 44691
Mon–Fri 7:30am–5pm · Sat–Sun Closed
8

K & B Water Well Drilling & Excavation

4.7 (47 reviews)
5990 Co Hwy 50, Mt Gilead, OH 43338
9

Tedrow Water Well Drilling

5.0 (8 reviews)
16560 Wooster Rd, Mt Vernon, OH 43050

Frequently Asked Questions

How much does a complete well installation cost in Pennsylvania?

A complete well installation in Pennsylvania typically costs $8,000 to $20,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. The biggest variable is well depth — deeper wells require more drilling and more pipe.

What's included in a complete well installation?

A complete installation includes site evaluation, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and initial water quality testing.

How long does it take to install a complete well system?

The entire process typically takes 1-3 weeks. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing/electrical connections 1-2 days. Allow additional time for water testing results (3-5 business days) before using the water for drinking.

More Well Installation Nearby

Related Services in Ashland

All services in Ashland, OH →